01Certificate

 

REPRESENTATIVE WORK

No.

Period

Title of the elaborated Study

Responsibility

Types of Studies, industrial sector

1

1995

Study of risk for refloating of the sunk objects without the intervention of the dredge and hoist crane, assuring the protection of the marine bio-system

Elaborator

Other specific domains

2

1996

Study of risk for accidental pollutions with mineral oils and protection with anti-pollution barrages

Elaborator

Prevention and control of pollution

3

1996

Contributions to complete the Romanian Naval Register, the chapter: Marine Pollution

Elaborator

Other specific domains

4

1997

Technological projection for de-pollution installations existing on board of the maritime ships according to The Marpol Convention

Elaborator

Prevention and control of pollution

5

1997

Technological projection for automatic radio beacons with transmission on shore of some environmental factors Water and Air nearby Constanta Harbor

Elaborator

Other specific domains

6

1998

Projects of assembly for automatic meteorological stations for drilling platforms and marine ships

Elaborator

Other specific domains

7

1999

Study of wastes management for Constanta Harbor

Co-worker

Wastes Inventory

8

2000

Study of incorporated management of wastes for Constanta City. Regional Strategy of wastes management. Wastes processing combine.

Co-worker

Wastes Inventory

9

2001

Study of incorporated management of wastes for Kazan City, capital of Tatarstan Republic,
1.500.000 inhabitants.

Elaborator

Wastes Inventory

10

2002

Studies for realizing garbage hollows corresponding to the E.U. standards but with native materials (low costs)

Elaborator

Wastes Inventory

11

2002

Studies of case for closing wastes hollows that do not correspond

Co-worker

 

Wastes Inventory

No.

Period

Title of the elaborated Study

Responsibility

Types of Studies, industrial sector

12

2003

Studies for introduction of the unconventional and recovered energies in species: “heat pump”

Co-worker

Energetic Industry

13

2004

Centre for global prevention of accidental pollutions at Black Sea. CERIA

Elaborator

Other specific domains

14

2004

Study of case – Underground pollution, ground-water sheet, Constanta City zone and Constanta Harbor

Co-worker

Contaminated fields

15

2005

Studies to inert the used grit that results from the ships sandblast

Elaborator

Other specific domains

16

2005

Ecological house from prefab structures

Inventor

Mineral and construction materials industry

17

2005

Study of  Wastes Inventory for deallocation of  real assets belonging to S.C. IMUM S.A. Medgidia,
respective “IMUM Steel Plant”

Elaborator

Wastes Inventory

18

2005

Study Environmental Audit of 1st level, for “Incinerator”,
in Smardan village, Tulcea district

Elaborator

Wastes Inventory

19

2005

Environmental Audit of 1st and 2nd level for “Incinerator”, situated in Altin-Tepe, district Tulcea

Elaborator

Wastes Inventory

20

2005

Environmental Impact Assessment for
“Incinerator of sanitary wastes and wastes infected from ships”, Constanta Harbor, 6th Gate

Elaborator

Wastes Inventory

21

2006

Environmental Impact Assessment for “Auto Show-room and auto service hall”, district Constanta, DN 3A

Elaborator

Infrastructure Project

22

2005

Environmental Impact Assessment for “Fuel Distribution Station”, situated in Constanta, Mangaliei Street

Elaborator

Chemical, petrochemical, and rubber industry

23

2006

Environmental Impact Assessment for “Fuel Distribution Station (Small, Middle and Dispersed services Industrial Units)”, Constanta, Street Verde, no. 29

Elaborator

 

 

Chemical, petrochemical, and rubber industry

 

No.

Period

Title of the elaborated Study

Responsibility

Types of Studies, industrial sector

24

2006

Environmental Impact Assessment for “Tourist Villa”, Mamaia Holiday Resort, Metropol Hotel zone

Elaborator

Infrastructure Project

25

2006

Environmental Impact Assessment for “Tourist Villa”, Mamaia Holiday Resort, Pinguin zone

Elaborator

Infrastructure Project

26

2006

Environmental Impact Assessment for „Multifunctional Buildings – Constanta harbor cliff in the precinct of gates 3 – 4”

Elaborator

Infrastructure Project

27

2006

Environmental Impact Assessment for “Ecologic Incinerator Station in Rompetrol Rafinare S.A. Precinct ”, Corbu Township, DJ 226, 23rd km

Elaborator

Wastes Inventory

28

2006

Environmental Audit of 1st level for S.C. MIDEX S.A, Corbu Township, DJ 226, 25th km

Elaborator

Other specific domains

29

2006

Environmental Impact Assessment and the Plan for Diminishing the Social Impact in “Nicolae Balcescu” Quarry,
district Constanta

Elaborator

Mineral and construction materials industry

30

2006

Environmental Factors Supervision Program of “Nicolae Balcescu” Quarry, district Constanta

Elaborator

Mineral and construction materials industry

31

2006

Technical Project for the Environment Reconstruction of “Nicolae Balcescu” Quarry, district Constanta

Elaborator

Mineral and construction materials industry

32

2006

Initial Plan for Activity Cessation of “Nicolae Balcescu” Quarry, district Constanta

Elaborator

Mineral and construction materials industry

33

2006

Evaluation Study of Social Impact and the Plan for Diminishing the Social Impact at the Mining Objective Iglicioara, S.C. CARPAT AGREGATE S.A.

Elaborator

Mineral and construction materials industry

34

2006

Environmental Factors Supervision Plan in the activity and post-closing period for the Mining Objective Iglicioara, S.C. CARPAT AGREGATE S.A.

Elaborator

Mineral and construction materials industry

No.

Period

Title of the elaborated Study

Responsibility

Types of Studies, industrial sector

35

2006

Technical Project for the Environment Reconstruction 2013-2019, Exploitation Perimeter of Iglicioara, S.C. CARPAT AGREGATE S.A.

Elaborator

Mineral and construction materials industry

36

2006

Initial Plan for Activity Cessation of Iglicioara Quarry, district Tulcea, S.C. CARPAT AGREGATE S.A.

Elaborator

Mineral and construction materials industry

37

2006

Evaluation Study of Social Impact and the Plan for Diminishing the Social Impact in “Trei Fantani” Quarry, district Tulcea

Elaborator

Mineral and construction materials industry

38

2006

Environmental Factors Supervision Program of “Trei Fantani” Quarry, district Tulcea

Elaborator

Mineral and construction materials industry

39

2006

Technical Project for the Environment Reconstruction of “Trei Fantani” Quarry, district Tulcea

Elaborator

Mineral and construction materials industry

40

2006

Initial Plan for Activity Cessation of “Trei Fantani” Quarry, district Tulcea

Elaborator

Mineral and construction materials industry

41

2006

Environmental Audit of 1st level for the section of Quarry Turcoaia, district Tulcea

Elaborator

Mineral and construction materials industry

42

2006

Environmental Impact Assessment for “Show-room and auto service”, Constanta, Street Mangaliei, no. 195

Coordinator

Infrastructure Project

43

2006

1. Shore and cliff protection in Costinesti
2. Environmental Impact Assessment for “Shore and cliff protection”, Costinesti,
district Constanta

Elaborator

Infrastructure Project

44

2006

1. Shore and cliff protection in Eforie Sud
2 Environmental Impact Assessment for “Shore and cliff protection”, Eforie Sud, district Constanta

Elaborator

Infrastructure Project

45

2006

Environmental Impact Assessment for “Hypermarket Commercial Complex type Real”, district Constanta, Street Constanta-Mangalia, no. 195

Coordinator

Alimentary Industry,
Wastes Inventory
Infrastructure Project,
Other types of projects

No.

Period

Title of the elaborated Study

Responsibility

Types of Studies, industrial sector

46

2006

Environmental Impact Assessment for
“Fuel Distribution Station”,
situated in Constanta, DN 2A

Elaborator

Chemical, petrochemical, and rubber industry

47

2006

Environmental Impact Assessment, and Environmental Audit of 1st and 2nd level for District Administration for Roads, Constanta

Co-worker

Infrastructure Projects

48

2006

Environmental Impact Assessment for
Installation of garbage sorting in district Constanta, city Constanta and district Dolj, city Craiova

Elaborator

Waste
Inventory

49

2006

Environmental Report for
“Urban Detail Plan – Mamaia Beach Residence”, the biggest residence in Constanta, north cliff Zone

Elaborator

Infrastructure Projects

50

2006

Report and Environmental Impact Assessment for “Assembly for energy production Macin 1 and Macin 2, with two wind turbines”, Macin Village, Tulcea District

Elaborator

Energetic Industry, Infrastructure Projects,
Other types of projects

51

2006

Report and Environmental Impact Assessment for “Wind Power Plant”, Corbu Township, Constanta District

Elaborator

Energetic Industry, Infrastructure Projects,
Other types of projects

52

2006

Report and Environmental Impact Assessment for “Wind Power Park of  3,25 MW of electric energy production” Topolog Township, Tulcea District

Elaborator

Energetic Industry, Infrastructure Projects,
Other types of projects

53

2006

National Coast Area Committee (CNZC) Presentation Documentation for “Mamaia Beach Residential Complex”, Constanta

Elaborator

Infrastructure
Projects, Tourism and Recreation, Other types of  Projects

54

2006

National Coast Area Committee (CNZC) Presentation Documentation for “5 Stars Hotel Ground floor + Mezzanine + 5 Floors”

Elaborator

Infrastructure
Projects,
Tourism and Recreation,
Other types of  Projects

55

2006

National Coast Area Committee (CNZC) Presentation Documentation for “Complex Arrangement of Tomis Harbor”

Elaborator

Alimentary Industry,
Wastes Inventory, Infrastructure Projects,
Tourism and Recreation,
Other types of  Projects

No.

Period

Title of the elaborated Study

Responsibility

Types of Studies, industrial sector

56

2006

Environmental Report, Urban Detail Plan phase, „Commercial Complex”, Alexandria, Teleorman District

Elaborator

Alimentary Industry,
Wastes Inventory, Infrastructure Projects,
Other types of  Projects

57

2007

Report and Environmental Impact Assessment for „Fuel distribution Station ”, in Constanta, DN 2A, Constanta District

Elaborator

Extractive Industry of Oil, Natural gases and Peat, Energetic Industry, Chemical, petrochemical, and rubber industry, Infrastructure Projects,

58

2007

Environmental Report, Urban Detail Plan phase, for „Ground floor + Mezzanine + 5 Floors Building – 5 stars Hotel”, in Mamaia Resort, near Rex Hotel

Elaborator

Alimentary Industry,
Wastes Inventory, Infrastructure Projects, Tourism and Recreation

59

2007

Environmental Audit of 1st level “Industrial and Commercial Harbor”, Tulcea Town, Tulcea District

Elaborator

Extractive Industry of Oil, Natural gases and Peat,  Wastes Inventory, Infrastructure Projects, Other types of  Projects

60

2007

Report and Environmental Impact Assessment for “Complex Arrangement of Tomis Harbor”, Constanta Town, Constanta District

Elaborator

Alimentary Industry, Infrastructure Projects, Tourism and Recreation, Other types of  Projects

61

2007

Report and Environmental Impact Assessment for „Ground floor + Mezzanine + 5 Floors Building – 5 stars Hotel”, in Mamaia Resort, near Rex Hotel

Elaborator

Alimentary Industry, Wastes Inventory, Infrastructure Projects, Tourism and Recreation

62

2007

Urban Detail Plan - Urban Detail Plan Modification Mamaia 2001, Mamaia Resort, Constanta District

Elaborator

Agriculture, forestry and pisciculture, Alimentary
Industry, Wastes Inventory, Infrastructure
Projects, Tourism and Recreation

63

2007

National Coast Area Committee (CNZC) Presentation Documentation for “Urban Detail Plan - Urban Detail Plan Modification Mamaia 2001”

Elaborator

Agriculture, forestry and pisciculture, Alimentary
Industry, Wastes Inventory, Infrastructure
Projects, Tourism and Recreation

No.

Period

Title of the elaborated Study

Responsibility

Types of Studies, industrial sector

64

2007

National Coast Area Committee (CNZC) Presentation Documentation for „Urban Detail Plan Basement+Ground Floor+10 Floors  Building Construction –Block of lodgings and Commercial spaces at Ground Floor, Constanta, Prelungirea Bucovinei Street, no. 10”

Elaborator

Wastes Inventory, Infrastructure Projects, Other types of  Projects

65

2007

Report and Environmental Impact Assessment for „Ships Operating on buoy in Midia Harbor area”

Elaborator

Energetic Industry,  Chemical, petrochemical, and rubber industry Wastes Inventory, Infrastructure Projects, Other types of  Projects

66

2007

National Coast Area Committee (CNZC) Presentation Documentation for „Ships Operating on buoy in
Midia Harbor area”

Elaborator

Energetic Industry,  Chemical, petrochemical, and rubber industry Wastes Inventory, Infrastructure Projects, Other types of  Projects

67

2007

Report and Environmental Impact Assessment for Residential Complex with service spaces at ground floor – Basement+Ground Floor+7Floors+8 Solitary „Popas III Mamaia”, Navodari Town, Constanta District

Elaborator

Wastes Inventory, Infrastructure Projects, Other types of  Projects

68

2007

National Coast Area Committee (CNZC) Presentation Documentation for Residential Complex with service spaces at ground floor – Basement+Ground Floor+7Floors+8 Solitary „Popas III Mamaia”, Navodari Town, Constanta District

Elaborator

Wastes Inventory, Infrastructure
Projects, Other types of  Projects

69

2007

Environmental Report, Zonal Urban Plan phase, for Zonal Urban Plan Residential Complex „Heliade intre Vii”, Bucharest, 2nd Sector, Heliade intre Vii Street, no. 70-72

Elaborator

 

Wastes Inventory, Infrastructure Projects, Other types of  Projects

 

No.

Period

Title of the elaborated Study

Responsibility

Types of Studies, industrial sector

70

2007

Report and Environmental Impact Assessment for „System of ecologic incineration with cooling and gasses purifying installations”, outside Lumina Township, Constanta District

Elaborator

Wastes Inventory, Infrastructure
Projects, Other types of  Projects

71

2007

Environmental Report, Zonal Urban Plan phase, for „Zonal Urban Plan Alpin Land – demarcation and rail sledge track”,
Predeal Town, Brasov District

Elaborator

Infrastructure Projects, Wastes Inventory, Tourism and Recreation

72

2007

Environmental Audit of 1st level and Report to 1st level Audit regarding suspension of the maintenance and reparation activity, of auto vehicles, from Chiliei Street, no. 103 – Constanta, RATC – Autonomous Administration of
Common Transport

Elaborator

Infrastructure Projects, Wastes Inventory, Other types of  Projects

73

2007

Risk Study for „Ships operating on buoy in Midia Harbor area”

Elaborator

Energetic Industry,  Chemical, petrochemical, and rubber industry Wastes Inventory, Infrastructure Projects, Other types of  Projects

74

2007

Environmental Impact Assessment for „Incineration Installation of dangerous wastes”, Isalnita Township,
Dolj District

Elaborator

Wastes Inventory, Infrastructure Projects, Other types of  Projects

75

2007

Report and Environmental Impact Assessment for „Construction of two wind turbines for production of electric energy”, Tulcea District, Baia Township, Ceamurlia de Sus Village, Dealul Ienicerilor Sector

Elaborator

Energetic Industry,  Infrastructure Projects, Other types of  Projects

76

2007

Report and Environmental Impact Assessment for „Wind Power Park with transformer station 110/20 kV and electric adapter”, Stejaru Township, Tulcea District

Elaborator

 

Energetic Industry,  Infrastructure
Projects, Other types of  Projects

No.

Period

Title of the elaborated Study

Responsibility

Types of Studies, industrial sector

77

2007

Report and Environmental Impact Assessment for Wind Power Park „Wind turbines”, Baia Township, Tulcea District

Elaborator

Energetic Industry,  Infrastructure
Projects, Other types of  Projects

78

2007

Report and Environmental Impact Assessment for „Emplacement of 4 wind turbines construction processes, enlargement of distribution circuits, construction, modification, reparation, modernization and rehabilitation of communication ways – access”, Constanta District, Outside Sacele Township, A20/5 Parcel

Elaborator

Energetic Industry,  Infrastructure Projects, Other types of  Projects

79

2007

Rehabilitation  of epuration system for Wine-preparation and bottled centre – Odobesti, District Vrancea

Notice W. M.

Water Management

80

2007

Feasibility study concerning technical solutions necessary for execution of a preepuration plant of wastewater outcome from technical process – SC FRESHTEX Textile Finishing Romania SRL, Brasov – working point

Feasibility study

Water Management

81

2007

Chanel collector for pluvial water, S-SW, Golesti, District Vrancea

P.T. + DDE

Water Management

82

2007

Drinking water supply and disposal of waste water for Complex PRAKTIKER Bacau, District Bacau

Notice W. M.

Water Management

83

2007

Drinking water supply and disposal of waste water for Complex PRAKTIKER Galati, District Galati

Notice W. M.

Water Management

84

2008

Report and Environmental Impact Assessment for Wind Park, Tulcea District, Outside Jurilovca Township

Elaborator

Energetic Industry,  Infrastructure Projects, Other types of  Projects

85

2008

Report and Environmental Impact Assessment for Wind Park, Tulcea District, Outside Baia Township

Elaborator

Energetic Industry,  Infrastructure Projects, Other types of  Projects

86

2008

Report for evaluation of contaminated land, Ilfov district, Otopeni city

Elaborator

 

Wastes Inventory, Other types of  Projects

No.

Period

Title of the elaborated Study

Responsibility

Types of Studies, industrial sector

87

2008

Environmental Impact Assessment for “Ecological Incinerator” DSVSA Constanta, District Constanta

Elaborator

Wastes Inventory, Other types of  Projects

88

2008

Report and Environmental Impact Assessment for Wind Park with 20 wind turbines, Tulcea District, Outside Sarichioi Township

Elaborator

Energetic Industry,  Infrastructure Projects, Other types of  Projects

89

2008

Report and Environmental Impact Assessment for Wind Park with 7 wind turbines, Tulcea District, Outside Topolog Township

Elaborator

Energetic Industry,  Infrastructure Projects, Other types of  Projects

90

2009

Report and Environmental Impact Assessment for Wind Park with 4 wind turbines, Tulcea District, Outside Daeni Township

Elaborator

Energetic Industry,  Infrastructure Projects, Other types of  Projects

91

2009

Report and Environmental Impact Assessment for 2 Wind Park with 4 and 3 wind turbines, Tulcea District, Outside Deleni Township

Elaborator

Energetic Industry,  Infrastructure Projects, Other types of  Projects

92

2009

Report and Environmental Impact Assessment for Wind Park with 5 wind turbines, Tulcea District, Outside Fagarasu Nou Township

Elaborator

Energetic Industry,  Infrastructure Projects, Other types of  Projects

93

2009

Report and Environmental Impact Assessment for Wind Park with 3 wind turbines, Constanta District, Outside Independenta Township

Elaborator

Energetic Industry,  Infrastructure Projects, Other types of  Projects

94

2009

Report and Environmental Impact Assessment for Wind Park with 6 wind turbines, Constanta District, Outside Nistoresti Township

Elaborator

Energetic Industry,  Infrastructure Projects, Other types of  Projects

95

2009

Report and Environmental Impact Assessment for Wind Park with 4 wind turbines, Constanta District, Outside Pestera Township

Elaborator

Energetic Industry,  Infrastructure Projects, Other types of  Projects

96

2009

Report and Environmental Impact Assessment for Wind Park with 4 wind turbines, Constanta District, Outside Piatra Township

Elaborator

 

Energetic Industry,  Infrastructure Projects, Other types of  Projects

No.

Period

Title of the elaborated Study

Responsibility

Types of Studies, industrial sector

97

2009

Report and Environmental Impact Assessment for Wind Park with 14 wind turbines, Constanta District, Outside Ciocarlia Township

Elaborator

 

Energetic Industry,  Infrastructure Projects, Other types of  Projects

98

2007

Obtaining Environmental Permit for ATC, MI-SWACO

Elaborator

Wastes Inventory,
Other types of  Projects

 

 

 

home