No. |
Period |
Title of the elaborated Study |
Responsibility |
Types of Studies, industrial sector |
1 |
1995 |
Study of risk for refloating of the sunk objects without the intervention of the dredge and hoist crane, assuring the protection of the marine bio-system |
Elaborator |
Other specific domains |
2 |
1996 |
Study of risk for accidental pollutions with mineral oils and protection with anti-pollution barrages |
Elaborator |
Prevention and control of pollution |
3 |
1996 |
Contributions to complete the Romanian Naval Register, the chapter: Marine Pollution |
Elaborator |
Other specific domains |
4 |
1997 |
Technological projection for de-pollution installations existing on board of the maritime ships according to The Marpol Convention |
Elaborator |
Prevention and control of pollution |
5 |
1997 |
Technological projection for automatic radio beacons with transmission on shore of some environmental factors Water and Air nearby Constanta Harbor |
Elaborator |
Other specific domains |
6 |
1998 |
Projects of assembly for automatic meteorological stations for drilling platforms and marine ships |
Elaborator |
Other specific domains |
7 |
1999 |
Study of wastes management for Constanta Harbor |
Co-worker |
Wastes Inventory |
8 |
2000 |
Study of incorporated management of wastes for Constanta City. Regional Strategy of wastes management. Wastes processing combine. |
Co-worker |
Wastes Inventory |
9 |
2001 |
Study of incorporated management of wastes for Kazan City, capital of Tatarstan Republic,
1.500.000 inhabitants. |
Elaborator |
Wastes Inventory |
10 |
2002 |
Studies for realizing garbage hollows corresponding to the E.U. standards but with native materials (low costs) |
Elaborator |
Wastes Inventory |
11 |
2002 |
Studies of case for closing wastes hollows that do not correspond |
Co-worker |
Wastes Inventory |
No. |
Period |
Title of the elaborated Study |
Responsibility |
Types of Studies, industrial sector |
12 |
2003 |
Studies for introduction of the unconventional and recovered energies in species: “heat pump” |
Co-worker |
Energetic Industry |
13 |
2004 |
Centre for global prevention of accidental pollutions at Black Sea. CERIA |
Elaborator |
Other specific domains |
14 |
2004 |
Study of case – Underground pollution, ground-water sheet, Constanta City zone and Constanta Harbor |
Co-worker |
Contaminated fields |
15 |
2005 |
Studies to inert the used grit that results from the ships sandblast |
Elaborator |
Other specific domains |
16 |
2005 |
Ecological house from prefab structures |
Inventor |
Mineral and construction materials industry |
17 |
2005 |
Study of Wastes Inventory for deallocation of real assets belonging to S.C. IMUM S.A. Medgidia,
respective “IMUM Steel Plant” |
Elaborator |
Wastes Inventory |
18 |
2005 |
Study Environmental Audit of 1st level, for “Incinerator”,
in Smardan village, Tulcea district |
Elaborator |
Wastes Inventory |
19 |
2005 |
Environmental Audit of 1st and 2nd level for “Incinerator”, situated in Altin-Tepe, district Tulcea |
Elaborator |
Wastes Inventory |
20 |
2005 |
Environmental Impact Assessment for
“Incinerator of sanitary wastes and wastes infected from ships”, Constanta Harbor, 6th Gate |
Elaborator |
Wastes Inventory |
21 |
2006 |
Environmental Impact Assessment for “Auto Show-room and auto service hall”, district Constanta, DN 3A |
Elaborator |
Infrastructure Project |
22 |
2005 |
Environmental Impact Assessment for “Fuel Distribution Station”, situated in Constanta, Mangaliei Street |
Elaborator |
Chemical, petrochemical, and rubber industry |
23 |
2006 |
Environmental Impact Assessment for “Fuel Distribution Station (Small, Middle and Dispersed services Industrial Units)”, Constanta, Street Verde, no. 29 |
Elaborator |
Chemical, petrochemical, and rubber industry
|
No. |
Period |
Title of the elaborated Study |
Responsibility |
Types of Studies, industrial sector |
24 |
2006 |
Environmental Impact Assessment for “Tourist Villa”, Mamaia Holiday Resort, Metropol Hotel zone |
Elaborator |
Infrastructure Project |
25 |
2006 |
Environmental Impact Assessment for “Tourist Villa”, Mamaia Holiday Resort, Pinguin zone |
Elaborator |
Infrastructure Project |
26 |
2006 |
Environmental Impact Assessment for „Multifunctional Buildings – Constanta harbor cliff in the precinct of gates 3 – 4” |
Elaborator |
Infrastructure Project |
27 |
2006 |
Environmental Impact Assessment for “Ecologic Incinerator Station in Rompetrol Rafinare S.A. Precinct ”, Corbu Township, DJ 226, 23rd km |
Elaborator |
Wastes Inventory |
28 |
2006 |
Environmental Audit of 1st level for S.C. MIDEX S.A, Corbu Township, DJ 226, 25th km |
Elaborator |
Other specific domains |
29 |
2006 |
Environmental Impact Assessment and the Plan for Diminishing the Social Impact in “Nicolae Balcescu” Quarry,
district Constanta |
Elaborator |
Mineral and construction materials industry |
30 |
2006 |
Environmental Factors Supervision Program of “Nicolae Balcescu” Quarry, district Constanta |
Elaborator |
Mineral and construction materials industry |
31 |
2006 |
Technical Project for the Environment Reconstruction of “Nicolae Balcescu” Quarry, district Constanta |
Elaborator |
Mineral and construction materials industry |
32 |
2006 |
Initial Plan for Activity Cessation of “Nicolae Balcescu” Quarry, district Constanta |
Elaborator |
Mineral and construction materials industry |
33 |
2006 |
Evaluation Study of Social Impact and the Plan for Diminishing the Social Impact at the Mining Objective Iglicioara, S.C. CARPAT AGREGATE S.A. |
Elaborator |
Mineral and construction materials industry |
34 |
2006 |
Environmental Factors Supervision Plan in the activity and post-closing period for the Mining Objective Iglicioara, S.C. CARPAT AGREGATE S.A. |
Elaborator |
Mineral and construction materials industry |
No. |
Period |
Title of the elaborated Study |
Responsibility |
Types of Studies, industrial sector |
35 |
2006 |
Technical Project for the Environment Reconstruction 2013-2019, Exploitation Perimeter of Iglicioara, S.C. CARPAT AGREGATE S.A. |
Elaborator |
Mineral and construction materials industry |
36 |
2006 |
Initial Plan for Activity Cessation of Iglicioara Quarry, district Tulcea, S.C. CARPAT AGREGATE S.A. |
Elaborator |
Mineral and construction materials industry |
37 |
2006 |
Evaluation Study of Social Impact and the Plan for Diminishing the Social Impact in “Trei Fantani” Quarry, district Tulcea |
Elaborator |
Mineral and construction materials industry |
38 |
2006 |
Environmental Factors Supervision Program of “Trei Fantani” Quarry, district Tulcea |
Elaborator |
Mineral and construction materials industry |
39 |
2006 |
Technical Project for the Environment Reconstruction of “Trei Fantani” Quarry, district Tulcea |
Elaborator |
Mineral and construction materials industry |
40 |
2006 |
Initial Plan for Activity Cessation of “Trei Fantani” Quarry, district Tulcea |
Elaborator |
Mineral and construction materials industry |
41 |
2006 |
Environmental Audit of 1st level for the section of Quarry Turcoaia, district Tulcea |
Elaborator |
Mineral and construction materials industry |
42 |
2006 |
Environmental Impact Assessment for “Show-room and auto service”, Constanta, Street Mangaliei, no. 195 |
Coordinator |
Infrastructure Project |
43 |
2006 |
1. Shore and cliff protection in Costinesti
2. Environmental Impact Assessment for “Shore and cliff protection”, Costinesti,
district Constanta |
Elaborator |
Infrastructure Project |
44 |
2006 |
1. Shore and cliff protection in Eforie Sud
2 Environmental Impact Assessment for “Shore and cliff protection”, Eforie Sud, district Constanta |
Elaborator |
Infrastructure Project |
45 |
2006 |
Environmental Impact Assessment for “Hypermarket Commercial Complex type Real”, district Constanta, Street Constanta-Mangalia, no. 195 |
Coordinator |
Alimentary Industry,
Wastes Inventory
Infrastructure Project,
Other types of projects |
No. |
Period |
Title of the elaborated Study |
Responsibility |
Types of Studies, industrial sector |
46 |
2006 |
Environmental Impact Assessment for
“Fuel Distribution Station”,
situated in Constanta, DN 2A |
Elaborator |
Chemical, petrochemical, and rubber industry |
47 |
2006 |
Environmental Impact Assessment, and Environmental Audit of 1st and 2nd level for District Administration for Roads, Constanta |
Co-worker |
Infrastructure Projects |
48 |
2006 |
Environmental Impact Assessment for
Installation of garbage sorting in district Constanta, city Constanta and district Dolj, city Craiova |
Elaborator |
Waste
Inventory |
49 |
2006 |
Environmental Report for
“Urban Detail Plan – Mamaia Beach Residence”, the biggest residence in Constanta, north cliff Zone |
Elaborator |
Infrastructure Projects |
50 |
2006 |
Report and Environmental Impact Assessment for “Assembly for energy production Macin 1 and Macin 2, with two wind turbines”, Macin Village, Tulcea District |
Elaborator |
Energetic Industry, Infrastructure Projects,
Other types of projects |
51 |
2006 |
Report and Environmental Impact Assessment for “Wind Power Plant”, Corbu Township, Constanta District |
Elaborator |
Energetic Industry, Infrastructure Projects,
Other types of projects |
52 |
2006 |
Report and Environmental Impact Assessment for “Wind Power Park of 3,25 MW of electric energy production” Topolog Township, Tulcea District |
Elaborator |
Energetic Industry, Infrastructure Projects,
Other types of projects |
53 |
2006 |
National Coast Area Committee (CNZC) Presentation Documentation for “Mamaia Beach Residential Complex”, Constanta |
Elaborator |
Infrastructure
Projects, Tourism and Recreation, Other types of Projects |
54 |
2006 |
National Coast Area Committee (CNZC) Presentation Documentation for “5 Stars Hotel Ground floor + Mezzanine + 5 Floors” |
Elaborator |
Infrastructure
Projects,
Tourism and Recreation,
Other types of Projects |
55 |
2006 |
National Coast Area Committee (CNZC) Presentation Documentation for “Complex Arrangement of Tomis Harbor” |
Elaborator |
Alimentary Industry,
Wastes Inventory, Infrastructure Projects,
Tourism and Recreation,
Other types of Projects |
No. |
Period |
Title of the elaborated Study |
Responsibility |
Types of Studies, industrial sector |
56 |
2006 |
Environmental Report, Urban Detail Plan phase, „Commercial Complex”, Alexandria, Teleorman District |
Elaborator |
Alimentary Industry,
Wastes Inventory, Infrastructure Projects,
Other types of Projects |
57 |
2007 |
Report and Environmental Impact Assessment for „Fuel distribution Station ”, in Constanta, DN 2A, Constanta District |
Elaborator |
Extractive Industry of Oil, Natural gases and Peat, Energetic Industry, Chemical, petrochemical, and rubber industry, Infrastructure Projects, |
58 |
2007 |
Environmental Report, Urban Detail Plan phase, for „Ground floor + Mezzanine + 5 Floors Building – 5 stars Hotel”, in Mamaia Resort, near Rex Hotel |
Elaborator |
Alimentary Industry,
Wastes Inventory, Infrastructure Projects, Tourism and Recreation |
59 |
2007 |
Environmental Audit of 1st level “Industrial and Commercial Harbor”, Tulcea Town, Tulcea District |
Elaborator |
Extractive Industry of Oil, Natural gases and Peat, Wastes Inventory, Infrastructure Projects, Other types of Projects |
60 |
2007 |
Report and Environmental Impact Assessment for “Complex Arrangement of Tomis Harbor”, Constanta Town, Constanta District |
Elaborator |
Alimentary Industry, Infrastructure Projects, Tourism and Recreation, Other types of Projects |
61 |
2007 |
Report and Environmental Impact Assessment for „Ground floor + Mezzanine + 5 Floors Building – 5 stars Hotel”, in Mamaia Resort, near Rex Hotel |
Elaborator |
Alimentary Industry, Wastes Inventory, Infrastructure Projects, Tourism and Recreation |
62 |
2007 |
Urban Detail Plan - Urban Detail Plan Modification Mamaia 2001, Mamaia Resort, Constanta District |
Elaborator |
Agriculture, forestry and pisciculture, Alimentary
Industry, Wastes Inventory, Infrastructure
Projects, Tourism and Recreation |
63 |
2007 |
National Coast Area Committee (CNZC) Presentation Documentation for “Urban Detail Plan - Urban Detail Plan Modification Mamaia 2001” |
Elaborator |
Agriculture, forestry and pisciculture, Alimentary
Industry, Wastes Inventory, Infrastructure
Projects, Tourism and Recreation |
No. |
Period |
Title of the elaborated Study |
Responsibility |
Types of Studies, industrial sector |
64 |
2007 |
National Coast Area Committee (CNZC) Presentation Documentation for „Urban Detail Plan Basement+Ground Floor+10 Floors Building Construction –Block of lodgings and Commercial spaces at Ground Floor, Constanta, Prelungirea Bucovinei Street, no. 10” |
Elaborator |
Wastes Inventory, Infrastructure Projects, Other types of Projects |
65 |
2007 |
Report and Environmental Impact Assessment for „Ships Operating on buoy in Midia Harbor area” |
Elaborator |
Energetic Industry, Chemical, petrochemical, and rubber industry Wastes Inventory, Infrastructure Projects, Other types of Projects |
66 |
2007 |
National Coast Area Committee (CNZC) Presentation Documentation for „Ships Operating on buoy in
Midia Harbor area” |
Elaborator |
Energetic Industry, Chemical, petrochemical, and rubber industry Wastes Inventory, Infrastructure Projects, Other types of Projects |
67 |
2007 |
Report and Environmental Impact Assessment for Residential Complex with service spaces at ground floor – Basement+Ground Floor+7Floors+8 Solitary „Popas III Mamaia”, Navodari Town, Constanta District |
Elaborator |
Wastes Inventory, Infrastructure Projects, Other types of Projects |
68 |
2007 |
National Coast Area Committee (CNZC) Presentation Documentation for Residential Complex with service spaces at ground floor – Basement+Ground Floor+7Floors+8 Solitary „Popas III Mamaia”, Navodari Town, Constanta District |
Elaborator |
Wastes Inventory, Infrastructure
Projects, Other types of Projects |
69 |
2007 |
Environmental Report, Zonal Urban Plan phase, for Zonal Urban Plan Residential Complex „Heliade intre Vii”, Bucharest, 2nd Sector, Heliade intre Vii Street, no. 70-72 |
Elaborator |
Wastes Inventory, Infrastructure Projects, Other types of Projects
|
No. |
Period |
Title of the elaborated Study |
Responsibility |
Types of Studies, industrial sector |
70 |
2007 |
Report and Environmental Impact Assessment for „System of ecologic incineration with cooling and gasses purifying installations”, outside Lumina Township, Constanta District |
Elaborator |
Wastes Inventory, Infrastructure
Projects, Other types of Projects |
71 |
2007 |
Environmental Report, Zonal Urban Plan phase, for „Zonal Urban Plan Alpin Land – demarcation and rail sledge track”,
Predeal Town, Brasov District |
Elaborator |
Infrastructure Projects, Wastes Inventory, Tourism and Recreation |
72 |
2007 |
Environmental Audit of 1st level and Report to 1st level Audit regarding suspension of the maintenance and reparation activity, of auto vehicles, from Chiliei Street, no. 103 – Constanta, RATC – Autonomous Administration of
Common Transport |
Elaborator |
Infrastructure Projects, Wastes Inventory, Other types of Projects |
73 |
2007 |
Risk Study for „Ships operating on buoy in Midia Harbor area” |
Elaborator |
Energetic Industry, Chemical, petrochemical, and rubber industry Wastes Inventory, Infrastructure Projects, Other types of Projects |
74 |
2007 |
Environmental Impact Assessment for „Incineration Installation of dangerous wastes”, Isalnita Township,
Dolj District |
Elaborator |
Wastes Inventory, Infrastructure Projects, Other types of Projects |
75 |
2007 |
Report and Environmental Impact Assessment for „Construction of two wind turbines for production of electric energy”, Tulcea District, Baia Township, Ceamurlia de Sus Village, Dealul Ienicerilor Sector |
Elaborator |
Energetic Industry, Infrastructure Projects, Other types of Projects |
76 |
2007 |
Report and Environmental Impact Assessment for „Wind Power Park with transformer station 110/20 kV and electric adapter”, Stejaru Township, Tulcea District |
Elaborator |
Energetic Industry, Infrastructure
Projects, Other types of Projects |
No. |
Period |
Title of the elaborated Study |
Responsibility |
Types of Studies, industrial sector |
77 |
2007 |
Report and Environmental Impact Assessment for Wind Power Park „Wind turbines”, Baia Township, Tulcea District |
Elaborator |
Energetic Industry, Infrastructure
Projects, Other types of Projects |
78 |
2007 |
Report and Environmental Impact Assessment for „Emplacement of 4 wind turbines construction processes, enlargement of distribution circuits, construction, modification, reparation, modernization and rehabilitation of communication ways – access”, Constanta District, Outside Sacele Township, A20/5 Parcel |
Elaborator |
Energetic Industry, Infrastructure Projects, Other types of Projects |
79 |
2007 |
Rehabilitation of epuration system for Wine-preparation and bottled centre – Odobesti, District Vrancea |
Notice W. M. |
Water Management |
80 |
2007 |
Feasibility study concerning technical solutions necessary for execution of a preepuration plant of wastewater outcome from technical process – SC FRESHTEX Textile Finishing Romania SRL, Brasov – working point |
Feasibility study |
Water Management |
81 |
2007 |
Chanel collector for pluvial water, S-SW, Golesti, District Vrancea |
P.T. + DDE |
Water Management |
82 |
2007 |
Drinking water supply and disposal of waste water for Complex PRAKTIKER Bacau, District Bacau |
Notice W. M. |
Water Management |
83 |
2007 |
Drinking water supply and disposal of waste water for Complex PRAKTIKER Galati, District Galati |
Notice W. M. |
Water Management |
84 |
2008 |
Report and Environmental Impact Assessment for Wind Park, Tulcea District, Outside Jurilovca Township |
Elaborator |
Energetic Industry, Infrastructure Projects, Other types of Projects |
85 |
2008 |
Report and Environmental Impact Assessment for Wind Park, Tulcea District, Outside Baia Township |
Elaborator |
Energetic Industry, Infrastructure Projects, Other types of Projects |
86 |
2008 |
Report for evaluation of contaminated land, Ilfov district, Otopeni city |
Elaborator |
Wastes Inventory, Other types of Projects |
No. |
Period |
Title of the elaborated Study |
Responsibility |
Types of Studies, industrial sector |
87 |
2008 |
Environmental Impact Assessment for “Ecological Incinerator” DSVSA Constanta, District Constanta |
Elaborator |
Wastes Inventory, Other types of Projects |
88 |
2008 |
Report and Environmental Impact Assessment for Wind Park with 20 wind turbines, Tulcea District, Outside Sarichioi Township |
Elaborator |
Energetic Industry, Infrastructure Projects, Other types of Projects |
89 |
2008 |
Report and Environmental Impact Assessment for Wind Park with 7 wind turbines, Tulcea District, Outside Topolog Township |
Elaborator |
Energetic Industry, Infrastructure Projects, Other types of Projects |
90 |
2009 |
Report and Environmental Impact Assessment for Wind Park with 4 wind turbines, Tulcea District, Outside Daeni Township |
Elaborator |
Energetic Industry, Infrastructure Projects, Other types of Projects |
91 |
2009 |
Report and Environmental Impact Assessment for 2 Wind Park with 4 and 3 wind turbines, Tulcea District, Outside Deleni Township |
Elaborator |
Energetic Industry, Infrastructure Projects, Other types of Projects |
92 |
2009 |
Report and Environmental Impact Assessment for Wind Park with 5 wind turbines, Tulcea District, Outside Fagarasu Nou Township |
Elaborator |
Energetic Industry, Infrastructure Projects, Other types of Projects |
93 |
2009 |
Report and Environmental Impact Assessment for Wind Park with 3 wind turbines, Constanta District, Outside Independenta Township |
Elaborator |
Energetic Industry, Infrastructure Projects, Other types of Projects |
94 |
2009 |
Report and Environmental Impact Assessment for Wind Park with 6 wind turbines, Constanta District, Outside Nistoresti Township |
Elaborator |
Energetic Industry, Infrastructure Projects, Other types of Projects |
95 |
2009 |
Report and Environmental Impact Assessment for Wind Park with 4 wind turbines, Constanta District, Outside Pestera Township |
Elaborator |
Energetic Industry, Infrastructure Projects, Other types of Projects |
96 |
2009 |
Report and Environmental Impact Assessment for Wind Park with 4 wind turbines, Constanta District, Outside Piatra Township |
Elaborator |
Energetic Industry, Infrastructure Projects, Other types of Projects |
No. |
Period |
Title of the elaborated Study |
Responsibility |
Types of Studies, industrial sector |
97 |
2009 |
Report and Environmental Impact Assessment for Wind Park with 14 wind turbines, Constanta District, Outside Ciocarlia Township |
Elaborator |
Energetic Industry, Infrastructure Projects, Other types of Projects |
98 |
2007 |
Obtaining Environmental Permit for ATC, MI-SWACO |
Elaborator |
Wastes Inventory,
Other types of Projects |